home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT / DAILY_1 / 921123.DFC < prev    next >
Text File  |  1992-12-18  |  11KB  |  255 lines

  1. "921123.DFC" (10686 bytes) was created on 11-23-92
  2.  
  3. 23-Nov-92 Daily File Collection
  4.    These files were added or updated between 22-Nov-92 at 21:00:00 {Central}
  5.                                          and 23-Nov-92 at 21:00:29.
  6.  
  7. =--=--=START=--=--= NASA Spacelink File Name:921123.REL
  8.  
  9. 11/23/92:  STS-53 PUBLIC AFFAIRS ACTIVITIES DURING CLASSIFIED OPERATIONS
  10.  
  11. HQ 92-100/STS-53 PA ACTIVITIES
  12.  
  13. Jim Cast
  14. Headquarters, Washington, D.C.             November 23, 1992
  15.  
  16. Jeff Carr
  17. Johnson Space Center, Houston
  18.  
  19. Maj. Dave Thurston
  20. U.S. Air Force
  21.  
  22. EDITORS NOTE:  N92-100
  23.  
  24.  
  25.      STS-53, NASA's 52nd Space Shuttle flight, currently is scheduled for
  26. liftoff at 6:59 a.m.  EST, Dec. 2.  The primary payload flying aboard Discovery
  27. is designated Department of Defense-1 (DoD-1) and is classified.  No public
  28. discussion will take place before, during or after the mission concerning the
  29. identity and purpose of DoD-1.
  30.  
  31.      At the request of the DoD, slight alterations will be made as to how
  32. "normal" public affairs activities will take place during the first few hours
  33. of the mission.  The major changes are:
  34.  
  35.    o At no time during the mission will television images of the payload bay be
  36. transmitted.
  37.  
  38.    o In-cabin television will be shown only after completion of DoD-1
  39. operations.
  40.  
  41.    o After the flight crew is given a "go" for orbital operations (following
  42. Payload Bay door opening), periodic mission control public affairs commentary
  43. will be restricted to orbiter/crew status until DoD-1 operations are complete.
  44. Television transmissions via NASA Select during this time will not include
  45. images revealing or relating to DoD-1 operations.
  46.  
  47.    o DoD-1 operations are scheduled to begin approximately 6 hours into the
  48. flight.  When these activities are completed, normal mission commentary and
  49. television coverage will commence and continue throughout the remainder of the
  50. flight.
  51.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  52. =--=--=-END-=--=--=
  53.  
  54. =--=--=START=--=--= NASA Spacelink File Name:921123.SHU
  55.  
  56. KSC SHUTTLE STATUS 11-23-92 
  57.  
  58.  
  59.                                SPACE SHUTTLE STATUS REPORT
  60.                                   Monday, November 23, 1992
  61. George H. Diller
  62. Kennedy Space Center
  63.  
  64.  
  65. Vehicle: OV-103/Space Shuttle Discovery
  66. Current Location: Launch Pad 39-A
  67. Mission: STS-53/DoD   Inclination: 57 degrees
  68. Launch:  Dec. 2  6:59 a.m.  Landing: KSC  Dec. 9  12:53 p.m.
  69. Mission duration: 7 days 5 hours 54 minutes    Crew Size: 5
  70.  
  71. IN WORK TODAY:
  72.  
  73. - auxiliary power unit tank pressurization and closeouts
  74. - load mass memory units (MMU)
  75. - main engine sensor calibrations
  76. - aft main engine compartment closeouts
  77. - solid rocket booster closeouts
  78. - payload closeouts
  79.  
  80.  
  81. WORK SCHEDULED:
  82.  
  83. - external tank purges Tuesday
  84. - close payload bay doors Tuesday night
  85. - retest Data Display Unit (DDU #1) Tuesday
  86. - orbiter aft systems confidence test Wednesday
  87. - pick up countdown 11 a.m. on Sunday for launch on Dec. 2
  88.  
  89.  
  90. WORK COMPLETED:
  91.  
  92. - final ordnance operations
  93. - OMS/RCS tank pressurization
  94. - change out of DDU #1
  95.  
  96.  
  97. SPECIAL TOPICS: Thursday and Friday are Thanksgiving holidays for the launch
  98. team and no work is scheduled.  Saturday is a contingency day for any catch-up
  99. or unscheduled work.
  100.  
  101.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  102. =--=--=-END-=--=--=
  103.  
  104. =--=--=START=--=--= NASA Spacelink File Name:921123.SKD
  105.  
  106. DAILY NEWS/TV SKED 11/23/92 
  107.  
  108. Daily News
  109. Monday, November 23, 1992  24-hour audio service at 202/755-1788
  110.  
  111.  % Activity to prepare Discovery for next week's launch coming to a close;
  112.  % Preparations of Endeavour for January flight progressing on schedule;
  113.  % Scout finally launches DOD payload from Vandenberg after 6 previous tries;
  114.  % Third Technology Transfer conference opens next Tuesday in Baltimore.
  115.  
  116. Preparations for the launch next Wednesday of Discovery for the STS-53
  117. Department of Defense mission are nearing completion at Kennedy Space Center's
  118. Launch Pad 39-A.  Over the weekend, technicians completed the payload interface
  119. verification tests and installed final ordnance devices on the orbiter and
  120. solid rocket booster/external tank components.  Activity scheduled for today
  121. includes loading of software into Discovery's onboard general purpose computer
  122. mass memory units.  Tomorrow, the external tank will undergo hydrogen and
  123. oxygen tank purges.  The mission will be the last scheduled DOD dedicated
  124. flight aboard a space shuttle and is scheduled for launch at 6:59 am EST on
  125. December 2.  The mission duration is planned for 7 days and 5 hours with a
  126. nominal end-of-mission landing at the KSC Shuttle Landing Facility. Mission
  127. commander is veteran astronaut David Walker. Mission pilot is Robert Cabana,
  128. also a veteran.
  129.  
  130. In other orbiter activity at Kennedy, technicians are nearing completion of
  131. stack assembly of Endeavour to its solid rocket booster/external tank in the
  132. Vehicle Assembly Building. The payload for Endeavour's STS-54 mission, the
  133. Tracking and Data Relay Satellite-F, is on Launch Pad 39-B where it underwent
  134. thruster tank fueling this past weekend.  The mission is presently scheduled
  135. for launch the second week in January. Also on this mission will be the Diffuse
  136. X-ray Spectrometer instrument, which will be used to observe galactic X-ray
  137. sources following the deployment of the TDRS-F.
  138.  
  139. * * * * * * * * * * * * * * * *
  140.  
  141. The Department of Defense Miniature Seeker Technology Integration payload was
  142. finally launched aboard a NASA Scout rocket this past Saturday, November 21.
  143. The launch went according to plan at the open of the launch window at 8:45 am
  144. EST. The launch, from Vandenberg Air Force Base Space Launch Complex 5, was
  145. reported to have been completely nominal.  This was the seventh launch attempt
  146. for the payload.  Previous attempts had been scrubbed for range control,
  147. vehicle power supply or guidance system, or ground support equipment problems.
  148.  
  149. * * * * * * * * * * * * * * * *
  150.  
  151. On Tuesday, December 1, NASA will host the third national technology transfer
  152. conference - Technology 2002 - at the Baltimore Convention Center. The
  153. three-day conference is sponsored by NASA, the NASA Tech Briefs magazine and
  154. the Technology Utilization Foundation and will spotlight leading-edge
  155. technologies from NASA and other federal agencies which can be used by U.S.
  156. industry to develop new or improved products or services.
  157.  
  158. Keynote speakers for the conference are U.S. Senator Barbara Mikulski
  159. (D-Maryland) and Executive Vice President and Chief Operating Officer of
  160. Rockwell International Sam Iacobellis. The conference this year will feature
  161. more than 120 presentations highlighting inventions which have potential
  162. commercial use in the fields of manufacturing, advanced materials, computing,
  163. communications, microelectronics, biotechnology, energy, and environmental
  164. science.
  165.  
  166. Since its inception three years ago, the conference has more than tripled in
  167. attendance.  Nearly 6,000 engineers and business managers are expected for this
  168. year's technology showcase.  More than 60,000 square feet of display space will
  169. be filled with exhibits from all nine NASA centers, other government agencies,
  170. universities and a diverse array of high-technology firms.  For additional
  171. information, please contact 800/944-6272.
  172.  
  173. * * * * * * * * * * * * * * * *
  174.  
  175. Here's the broadcast schedule for Public Affairs events on NASA Select TV. Note
  176. that all events and times may change without notice, and that all times listed
  177. are Eastern. Live indicates a program is transmitted live.
  178.  
  179. Monday, November 23, 1992
  180. Live   12:00 pm  NASA Today news program, today 
  181.                  featuring a preview of what the upcoming STS-53 mission 
  182.                  is about; a look at the third NASA Town Meeting held last 
  183.                  week in Indianapolis; a report on the recent discovery of 
  184.                  a dust cloud possibly circling a Black Hole; a look at a 
  185.                  new type of semiconductor laser and the potential 
  186.                  commercial implications of the device; and, as usual, a 
  187.                  look back at NASA activity on this date in history.
  188.        12:15 pm  Aeronautics & Space Report.
  189.        12:30 pm  Age of Space Transportation.
  190. Live    1:00 pm  Magellan Science Seminar from Jet 
  191.                  Propulsion Laboratory featuring Dr. David Senske, 
  192.                  Magellan research scientist, with a report on Venus' 
  193.                  Geophysical Patterns.
  194.         2:00 pm  Starfinder program #13.
  195.         2:30 pm  Human Machine.
  196.         3:00 pm  Total Quality Management program #1 from 
  197.                  the University of New Mexico series.
  198.         4:00 pm  8:00 pm and 12:00 midnight  - NASA Today 
  199.                    and subsequent programming repeats.
  200.   
  201. NASA Select TV is carried on GE Satcom F2R, transponder 13, C-Band, 72 degrees
  202. West Longitude, transponder frequency is 3960 MegaHertz, audio subcarrier is
  203. 6.8 MHz, polarization is vertical.
  204.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  205. =--=--=-END-=--=--=
  206.  
  207. =--=--=START=--=--= NASA Spacelink File Name:6_2_2_41_5.TXT
  208.  
  209. STS-53 PUBLIC AFFAIRS ACTIVITIES DURING CLASSIFIED OPERATIONS
  210.  
  211. HQ 92-100/STS-53 PA ACTIVITIES
  212.  
  213. Jim Cast
  214. Headquarters, Washington, D.C.             November 23, 1992
  215.  
  216. Jeff Carr
  217. Johnson Space Center, Houston
  218.  
  219. Maj. Dave Thurston
  220. U.S. Air Force
  221.  
  222. EDITORS NOTE:  N92-100
  223.  
  224.  
  225.      STS-53, NASA's 52nd Space Shuttle flight, currently is scheduled for
  226. liftoff at 6:59 a.m.  EST, Dec. 2.  The primary payload flying aboard Discovery
  227. is designated Department of Defense-1 (DoD-1) and is classified.  No public
  228. discussion will take place before, during or after the mission concerning the
  229. identity and purpose of DoD-1.
  230.  
  231.      At the request of the DoD, slight alterations will be made as to how
  232. "normal" public affairs activities will take place during the first few hours
  233. of the mission.  The major changes are:
  234.  
  235.    o At no time during the mission will television images of the payload bay be
  236. transmitted.
  237.  
  238.    o In-cabin television will be shown only after completion of DoD-1
  239. operations.
  240.  
  241.    o After the flight crew is given a "go" for orbital operations (following
  242. Payload Bay door opening), periodic mission control public affairs commentary
  243. will be restricted to orbiter/crew status until DoD-1 operations are complete.
  244. Television transmissions via NASA Select during this time will not include
  245. images revealing or relating to DoD-1 operations.
  246.  
  247.    o DoD-1 operations are scheduled to begin approximately 6 hours into the
  248. flight.  When these activities are completed, normal mission commentary and
  249. television coverage will commence and continue throughout the remainder of the
  250. flight.
  251.      Source:NASA Spacelink    Modem:205-895-0028  Internet:192.149.89.61
  252. =--=--=-END-=--=--=
  253.  
  254. =--=END OF COLLECTION---COLLECTED 4 FILES---COMPLETED 21:11:23=--=
  255.